Zum Inhalt springen
Support kontaktieren

Field Activity Report Template

Dieser Inhalt ist noch nicht in deiner Sprache verfügbar.

  • Oil Level Check: The level was below the minimum requirement.
  • Drainage: A full drain was not necessary.
  • Oil Refill: Hydraulic oil was added.

  • Type of Oil Used: Hydraulic Oil ISO VG 46
  • Quantity of Oil Added: 25 litres
  • Cleaning: Dusting and cleaning of the air filters.
  • Functional Tests: Machine restarted, pressure tests were conclusive.
  • Result: Pressure has returned to its optimal level, and the machine is functioning correctly.

  • Next Intervention: An oil level check is scheduled in 6 months.
  • Jean-Claude’s Comment: “The cylinder seal is starting to show signs of wear. Its replacement should be scheduled during the next major maintenance to prevent a leak.”